11Operation and installation manual SOLIVIA 5.0 AP G3 TR
The solar inverter is functional in on-grid operation exclusively. An automated isolation
point, which is approved by a certication agency, guarantees secure disconnection in
case of circuit isolation or interruptions in power supply and avoids isolated operation.
The disconnection equipment allows for automatic isolation for in-plant generation sys-
tems of nominal power ≤ 4.6 kVA, with single-phase parallel feed-in through the solar
inverter into the grid.
5.3 Equipment overview
1. Connections for PV modules
2. Grid connection
3. Interface connection RS485 (EIA485)
4. Display for status messages and keypad for operation
5. Light-emitting diodes for operational status display
(1)
(4)
(5)
(2) (3)