Delta LTL2000S Spécifications Page 47

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 55
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 46
DELTA LTL2000 Retrometer 41
Status after first Zero
After executing a ZERO function the status will look
like this.
It shows that the Zero measurement has been
executed and when this was done.
No calibration has been done yet.
The values recorded during the zero measurement,
the system leak, the dark signal and the offset signal
are listed.
The voltage conditions during the zero measurement
are shown:
Battery voltage measured when the lamp is on, the
voltage with the lamp off and finally the PMT voltage:
It can be seen that the data from the zero measure-
ment went into the Test Log.
Vue de la page 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 53 54 55

Commentaires sur ces manuels

Pas de commentaire